framing for efficiency

September 22, 2012

framing has been moving along at skidmore passivhaus since we placed our slab on grade.

the house is quickly taking shape thanks to dam framers (doug marshak and crew).

there are a few things that make the framing on this house just a little different from the typical house:

  • untreated bottom plates on 30lb building paper
  • 2×8 wall studs at 24″ o.c. (roof trusses align)
  • balloon framed 2 story walls
  • upper floor hung from ledgers
  • single top plates that interlock at the splices
  • open corners with minimal blocking
  • open web trusses with sloped top and level bottom
  • header free openings (except for the living room doors)
  • long walls on plywood module

All of this results in more space for insulation!

Plus there’s less wood used and less material cost.

Some of the many next steps include:

  • taping the plywood with SIGA to create the air barrier
  • installing the single ply membrane roof
  • prepping the rough openings with Prosoco Fast Flash
  • roughing in plumbing, HRV, and electrical

Check back soon for updates.

in situ architecture

Advertisements

2 Responses to “framing for efficiency”

  1. Michael Schunk, RA, CPHC Says:

    was the osb on the concrete slab for protection during framing?


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s