pre-certified

January 15, 2013

after 6 months of hard work, persistence and a bit of cash, skidmore passivhaus is officially pre-certified.

PHIUS+ pre-cert letter

(next time i will do a more accurate solar shading report BEFORE the start of construction)

solar pathfinder

here are the latest results of the PHPP model:

phpp

more photos soon.

Advertisements

going solar

January 9, 2013

the rare sunny portland winter day has allowed us to regale in the golden rays.

DSC_0997

DSC_0998

glorious sun reaches all the way to the back of the kitchen.

DSC_1001

the south facing windows / heaters are working.

DSC_1000

DSC_1002

the studio flooded in mid-day sun.

DSC_1003

the breezeway will be a study in light and dark.

DSC_0999

rejoice.

in addition to direct gain, we will have a small PV system on the roof.  more on that later.

insitu architecture

stair progresses

January 4, 2013

while most of the attention has been focused on the insulation, windows and air sealing, the interior stair has made slow but steady progress.

DSC_0837

DSC_0838

stringers are tube steel bolted to concrete landing and wood wall

DSC_0839

tread risers are 1/8″ thick bent plate steel

DSC_0841

DSC_0851

everything is fit up and welded in place

DSC_0986

guardrail is 1″ sq tube steel verticals

DSC_0908

DSC_0983

DSC_0999

steel will be left natural with all the signs of fabrication exposed

DSC_1001

a clear coat will be applied at completion

IMG_1696

still more to go but we think it’s coming along nicely.

thanks to alameda metal works for their fine work.